Sela is a registered architect, LEED Accredited Professional, and graduate of the University of Virginia and Smith College with 15 years of experience at BIA.studio in all phases of design and construction. She has experience in the design and renovation of institutional, commercial and transportation architecture, and her versatility and professional strengths extend across all phases of design and construction. She has conducted feasibility and design studies, overseen renovations and new construction projects and is an experienced construction phase administrator. She is responsible for running projects from early design and planning through construction administration.
Sela has considerable experience in transit station accessibility and knowledge of the MBTA system, working to develop and implement the MBTA’s new ADA-compliant system-wide wayfinding signage system at more than 280 subway and commuter rail stations. She has worked closely with the MBTA’s Design & Construction and System-Wide Accessibility departments, training their staff on the new approach towards station navigation.
As Project Architect for the Steamship Authority Administrative Offices Ms. Bailey led the design and consultant team through all phases of planning, design, and construction administration. More recently Sela has been in charge of numerous higher education projects, often on very tight schedules. She consistently gets high praise from clients who trust her leadership and ability to see projects through to conclusion.
Registration
Massachusetts #50753
Maine #ARC5369
Connecticut #ARI.0015600
NCARB Certification
LEED AP BD+C
Education
University of Virginia, Master of Architecture, 2010
Smith College, Bachelor of Arts in Art: Architecture and Urbanism 2006
Affiliations
AIA – American Institute of Architects
BSA – Boston Society of Architects
Relevant Experience
UMass Lowell: Costello Basketball Suite; numerous on-call studies and upgrades, Lowell, MA
UMass Amherst: Brooks Hall residential life renovations; numerous on-call studies and upgrades, Amherst & Newton, MA
Fitchburg State University: Anthony Admissions department renovations; numerous on call studies and upgrades, Fitchburg, MA
Holyoke Community College: Theater Code Upgrades; numerous on-call studies and upgrades, Holyoke, MA
Cape Cod Community College: Campus-Wide Building Envelope Study; numerous on-call studies and upgrades, West Barnstable, MA
Massachusetts Maritime Academy: Tower Lane Parking Garage; numerous on-call studies and upgrades, Buzzards Bay, MA
UMass Medical School: Co-gen Power Plant Expansion, Worcester, MA
UMaine: Energy Center, Orono, ME
Steamship Authority: New Administration Offices, Falmouth, MA
Steamship Authority: Woods Hole Ferry Terminal Feasibility Study, Woods Hole, MA
Steamship Authority: Woods Hole Temporary Ferry Terminal Phase 1, Woods Hole, MA
Steamship Authority: Woods Hole Ferry Terminal Reconstruction, Woods Hole, MA
South Station Bus Terminal Renovations, Boston, MA
New England Aquarium: Visitor Experience Master Plan, Boston, MA
Capron Park Zoo: Master Plan, Attleboro, MA
Zoo New England: Asset Assessment Study and Campus Redevelopment Plan for the Franklin Park and Stone Zoos, Boston and Stoneham, MA
Zoo New England: Stone Zoo Welcome Plaza and new outdoor Flamingo Exhibit, Stoneham, MA
MBTA System-Wide Wayfinding Signage System
MBTA Pilot Projects for new Wayfinding System: Government Center Station, Science Park Station, Wonderland Station, Orient Height Station, & South Weymouth CR Station